Patton Avenue Water Main Project
Status
Bidding Closed
Prebid Date9/13/23 9:00am
Bid Date10/3/23 2:00pm
Company & Contacts
Location
Patton Avenue at Watson Way
Mandatory Prebid Meeting.
The Project must be completed within 115 calendar days (70 working days), beginning ten (10) calendar days after the date on which the notice to proceed (“Notice to Proceed”) is sent by the District to the contractor that is awarded a bid for this Project (“Contractor”).
The Project consists of all Work described in the Contract Documents and generally consists of furnishing of all labor, materials, tax, equipment and services for the construction and completion of the following work all within the roadways of Patton Avenue and Pardal, Alondra, and Perdez Courts, within the City of Citrus Heights. The work to be completed includes, but is not limited to, installing 1200 linear feet of 8-inch water main, 653 linear feet of 6-inch water main, one (1) 8-inch gate valve, six (6) 6-inch gate valves, three (3) steamer fire hydrants, three (3) 2-inch blow-off valves, thirty-one (31) 1-inch water services with curb stops, six (6) 1-inch water service reconnections at the main and two (2) 1-inch metered water service.