Public Jobs

Bidding Closed
2/26/20 2:00 pm
SKYWAY WELL #14 CONSTRUCTION
KASL Consulting Engineers Inc.
Skyway Dr, Fair Oaks CA
Project No. C19WTSTSTH
Bidding Closed
2/26/20 2:00 pm
NEW YORK WELL #13 CONSTRUCTION
KASL Consulting Engineers Inc.
New York Ave, Fair Oaks CA
Project No. C19WTSTSTH
Bidding Closed
1/28/20 2:00 pm
Michigan Drive and Cologne Lane Water Main Project
Citrus Heights Water District
Citrus Heights
Water Main Installation
Bidding Closed
1/14/20 2:00 pm
First Bridge Replacement
KASL Consulting Engineers Inc.
3097 Cottage Way, Sacramento
First Bridge Replacement
Bidding Closed
1/8/20 2:00 pm
Cottage Park, Community Building Restrooms and Pool Restrooms and Showers Project
Fulton-El Camino Recreation & Park District
3097 Cottage Way, Sacramento, CA 95825
Restroom and swower remodel to meet ADA
Bidding Closed
1/10/20 2:00 pm
Rio Linda-Elverta Water District - Well 16
Domenichelli and Associates
Rio Linda
Well 16
Bidding Closed
11/26/19 2:00 pm
Fair Oaks Boulevard Waterline
Carmichael Water District
Fair Oaks Blvd, from Robertson Ave. to North Ave.; Sacramento County, CA
The work generally includes, but is not limited to, furnishing and installing over 2000 LF of waterline ranging from 8-inch to 16-inch diameter ductile iron pipe, isolation valves, abandonment of existing water mains, relocation and reconnection of existing water services and fire hydrants to the new waterline, testing and disinfection, asphalt removal and replacement of pavement, and traffic control. Contractor will be required to coordination with the County of Sacramento’s Fair Oaks Boulevard Improvement project to be constructed concurrently with this project.
Bidding Closed
6/6/19 2:00 pm
FIRST BRIDGE REPLACEMENT, STRONG RANCH SLOUGH, COTTAGE PARK
KASL Consulting Engineers Inc.
STRONG RANCH SLOUGH, COTTAGE PARK
FIRST BRIDGE REPLACEMENT