Ella Way Well Project
Status
Bidding Closed
Prebid Date | 9/11/24 9:00am |
Bid Date | 10/15/24 2:00pm |
Location
8030 Ella Way
Prebid Meeting Mandatory.
The Project must be completed within 260 calendar days, beginning ten (10) calendar days after the date on which the notice to proceed ("Notice to Proceed") is sent by the District to the contractor that is awarded a bid for this Project ("Contractor").
The Project consists of all Work described in the Contract Documents and generally consists of furnishing of all labor, materials, tax, equipment, and services for the construction and completion of the following work all within the existing District’s property at 8030 Ella Way. The work to be completed includes but is not limited to, constructing all above-ground appurtenances for a new groundwater production well including, a block building; sewer, distribution, storm drain, and system piping; pump and motor; site drainage improvements; new pavement; concrete perimeter security wall ad steel fencing; automated access gate; and all site electrical and lighting.